• Our New Construction Interior Painting Process

    Introduction

    Thanks for inviting us in.
    Letting a crew into your home is an act of trust, and we respect that.
    A bit about how we do things:
    We listen before we paint.
    You know what you like. Our job is to help you get it — not talk you into something you don’t want.
    We show up when we say we will.
    And if something changes, you'll hear it from us in advance.
    We keep it open and honest.
    No vague line items, no quiet add-ons. If we have to step outside of scope of work we discuss it with you first.
    We've been at this since 2000, we're covered by WorkSafeBC, and we carry liability insurance — so you and our team are both protected.
    This estimate is here to help you make a good decision, not push you into one. Read it, ask us anything. And if something's outside your budget, tell us — we'd rather find a way.

    Terms and Conditions

    Our estimate. We hold our pricing as long as we can. The only thing that moves it is costs outside our control — materials, fuel, wages, and the like. If anything changes before you approve, we'll tell you.

    No deposit. We don't ask for money up front. You have every right to change your mind, and we'd never hold a deposit over you.
    If you need to cancel or reschedule, just give us as much notice as you can. We hold time for your job and keep a crew employed --a little warning lets us fill the gap and keeps everyone working.
    Reviewing the work. When we're finished, we'll let you know and ask you to look everything over. If something isn't right, tell us within a couple of days and we'll make it right. If we don't hear from you, we'll send the invoice.
    Payment. Invoices are due within 7 days of the invoice date, unless we've made other arrangements with you. We accept e‑transfer or cheque. Prefer credit card? We can run it through PayPal, though it carries a small processing fee. Balances unpaid after 30 days carry 2% monthly interest, unless a payment plan has been arranged.

    Changes to the job. If you ask for work beyond the original estimate, or we uncover something hidden once we start, we'll talk it through and agree on any change before we carry on.

    What to Expect with New Construction Interior Painting

    At Sonshine Girls Painting, we know new construction projects have a lot of moving parts. Painters are often working between drywallers, carpenters, flooring installers, electricians, plumbers, cabinet installers, and other trades.
    Because of that, clear timing, access, scope, and deficiency expectations are especially important.
    Every new construction project is based on the surfaces listed in your estimate and the condition of the home when we arrive.
    Standard New Construction Paint Process
    Unless otherwise noted in your estimate, our standard new construction interior painting process includes:
    • Three coats on walls: one primer coat and two finish coats
    • Two coats on ceilings
    • Two coats on trim and doors, sprayed where possible
    • Caulking and filling of standard trim
    • Up to 6 hours of trade damage repair
    • One deficiency/touch-up visit after completion, with a deficiency list provided in advance
    Products are selected based on the surfaces, finish, and project needs. Our standard new construction products are listed in estimate.
    Product selection may vary if another product is better suited to the project.
    Our Preferred Painting Schedule
    Our preferred process is completed in three trips:
    Trip 1
    Finish ceilings
    Paint closets
    Prime walls
    Trip 2
    Caulk and fill trim
    Spray trim and doors where possible
    Apply base coat on walls
    Trip 3
    Apply final coat on walls after other trades are complete
    Paint any new trim installed after flooring, usually by brush and roller
    This schedule helps protect the finish and reduces unnecessary touch-ups caused by other trades working after the final coat is complete.
    Trim, Doors, and Flooring Timing
    Where possible, trim and doors are sprayed for the cleanest finish.
    Trim installed after flooring is typically painted by brush and roller because spraying may no longer be practical once floors and finished surfaces are in place.
    If additional masking, protection, setup, or hand-finishing is required because of installation timing, finished flooring, or other completed surfaces, additional charges may apply.
    Trade Damage
    New construction painting includes up to 6 hours of trade damage repair.
    Trade damage may include minor dents, scratches, scuffs, nail marks, small dings, or damage caused by other trades after painting has started.
    Any trade damage repair beyond the included 6 hours will be billed at $85/hour.
    Trade damage does not include major drywall repair, texture repair, carpentry repair, water damage, poorly finished drywall, large holes, or repairs that should be completed by another trade.
    Deficiencies and Touch-Ups
    We will attend once to complete deficiencies after the painting work is finished.
    Before we attend, we require a written deficiency list of all items needing attention. This allows us to arrive prepared and complete the touch-ups efficiently.
    Any additional deficiency or touch-up trips after we have already attended once will be subject to a minimum setup charge of $500.
    This is because each return visit requires scheduling, travel, setup, product preparation, cleanup, and crew time.
    What Is Not Included Unless Listed
    Unless specifically included in your estimate, new construction pricing does not allow for:
    • Crown moulding
    • Spindles
    • Decorative finishes
    • Transoms
    • Oversized doors
    • Backsides of bifold doors
    • Specialty doors or detailed trim
    • Custom millwork
    • Built-ins
    • Cabinet painting
    • Staining or clear coating
    • Wallpaper removal
    • Specialty coatings
    • Major drywall repair
    • Major sanding or surface correction
    • Texture repair or texture matching
    These items can often be added, but they must be quoted separately or approved as an additional charge.
    Paint Colour and Coverage
    Coverage is based on the colour selected.
    Some colours require additional coats to achieve full coverage. This is especially common with bright colours, deep colours, reds, yellows, oranges, deep blues, deep greens, whites, and highly pigmented colours.
    If additional coats are required beyond the quoted scope, they will be an add-on charge.
    Final colour approval is the client’s responsibility. We recommend viewing colour samples in the actual space before making a final decision, as colour can shift depending on lighting, surrounding finishes, time of day, and sheen.
    Surface Expectations
    New construction walls and trim are not automatically flawless.
    The final painted finish depends on the quality of drywall finishing, sanding, trim installation, caulking, lighting, surface texture, and work completed by other trades.
    Paint can improve the appearance of a surface, but it does not hide poor drywall work, uneven sanding, dents, waves, raised seams, nail pops, gaps, or installation issues unless those repairs are specifically included in the estimate.
    If a higher level of surface correction is required, such as extensive drywall repair, skim coating, re-sanding, or trim correction, that work would need to be quoted separately.
    Access and Site Conditions
    The work area must be ready for painting when we arrive.
    This includes:
    • Clear access to the areas being painted
    • Reasonable heat, light, and ventilation
    • Finished drywall sanding and cleanup before primer
    • Other trades scheduled appropriately around painting
    • Flooring, cabinetry, and finished surfaces protected or scheduled in a way that allows proper painting
    • Water and power available on site where needed
    Delays caused by site readiness, other trades, missing materials, access
    issues, or incomplete work may affect scheduling and pricing.
    Safety and Insurance
    Sonshine Girls Painting is covered by WorkSafeBC and carries liability insurance.
    We work with safety in mind for our crew, your project, and the surrounding property.
    Please Note
    New construction painting is not a repair, cleaning, moving, carpentry, drywall, or deficiency management service unless those items are specifically included in your estimate.
    Our goal is to provide clear expectations, a smooth process, and a clean, professional finish that works with the construction schedule.